Proposition 4 - Drainage

This is for control of flooding, runoff and other drainage projects as identified in the City's Master Drainage Plan. Four project areas were identified.  

Project Area 1 - West Goforth Road (Fire Station) and Bluff Street Area 

The general scope of work for this project includes:
  • Channel Improvements and culvert upgrades along W. Goforth and Union Pacific Railroad Track
  • Flood diversion (relief) channel from unnamed tributary to Onion Creek
    • Box culverts at Jack C. Hays Trail (FM 967)
Project Area 2 - Houston Street Area
The general scope of work for this project includes:
  • Channel Improvements and culvert upgrades along Houston St., Railroad St., and main channel
  • New storm drain inlets at Houston St. and Rose St.  
Project Area 3 - Oxbow Neighborhood Area
The general scope of work for this project includes:
  • Channel Improvements and culvert upgrades along main channel
Project Area 4 - Lifschutz Headwaters Area
The general scope of work for this project includes:
  • Voluntary Buyouts proposed
    • 3 Manufactured homes on 1/2 acre lots


Proposition 4 - Drainage Improvements (Left Click for Larger Image)

Project Area 1 - West Goforth and Bluff Street

Project Area 1

Project Area 2 - Houston Street Area

Project Area 2

Project Area 3 - Oxbow Neighborhood Area

Project Area 3

Project Area 4 - Lifschutz Headwaters Area

Project Area 4